精品男人天堂,精品国产专区,97福利影院,最新三级在线,国产美女主播福利,日韩v91综合区,九九99

  Homepage      Favorite      中文版
Home About Us News info Products Services Recruitment Contact us
SERVICES
Marketing
After Services
Question
Downloads
CONTACT US
Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
Tel: +86-592-6539999
E-mail: bussiness@xmzzj.com

Question
Location:Home → Services → Question
Inspection and maintenance operations before and after the loader
Public date:2015-1-21   Hits:15426

Daily inspection and maintenance of pre-and post-job

Engine, electrical, instrumentation section

1.Check the water level in the tank。
2.Check the fuel oil tank。
3.Check the engine oil sump capacity。
4.Tightness check the tubing, pipes, pipe and various parts of the。
5.Check the battery terminal。

Chassis part

1.Check the hydraulic fluid amount of work。
2.Check the tightness of the hydraulic system piping and accessories。
3.Check the foot brake, hand brake work is reliable。
4.Check the joystick in the neutral position is flexible and。
5.Check the tire pressure (front: 0.30 ~ 0.32MPa, rear: 0.28 ~ 0.30MPa) is normal, tire bolts are loose, the locking force: 830N.m. Tire pressure must be controlled within the specified range, otherwise it would cause a major accident, such as a flat tire, causing casualties and losses。
6.Check before connecting the rear propeller shaft bolt is loose, shedding phenomenon, locking force: 130 ~ 215N.m。
7.Check the pin connecting bolt is loose。

Bolt locking force (unlabeled bolt grade 4.8)


Thread diametermm

6

8

10
(8.8Level)

12
(8.8Level)

14

16
(8.8Level)

18

20

22

24

27

30

36

TorqueN.m

4

9.5

48

86

51

220

112

160

220

280

410

550

970

8.Check the water level, the gearbox oil level, hydraulic oil, brake fluid (brake fluid) oil level [regular maintenance according to section 3.3], check for oil spills, leaks, air leaks。
9.Each nozzle grease filling (once a day, at least 3 to 4 times per week)。

Start the engine

1.Check the meter indication is normal。
2.Check the lighting equipment, horn, wiper, brake lights work。
3.Check the operation of the working device manipulation case。
4.Whether listening to the low-speed operation of the engine is working properly。
5.Engagement stall run。

 


Next  |   Return to
About Us
Company profile
Culture
Organizational
Development
Subsidiaries
Certificates
Products
Wheel Loader
Block Handling Wheel Loader
Excavator
Other
Spare Parts
News
Company News
Trade News
Exhibitions
Videos
Services
Marketing
After Services
Question
Downloads
Recruitment
Talent Concept
Jobs
Contact Us
Feedback
Contact us
Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
Two-dimensional [Close]

點擊這里給我發(fā)消息
點擊這里給我發(fā)消息
秦安县| 随州市| 如东县| 永泰县| 博湖县| 鄄城县| 芷江| 桐柏县| 南郑县| 临江市| 道真| 广德县| 德格县| 依安县| 成都市| 富蕴县| 绥江县| 洛阳市| 墨竹工卡县| 云阳县| 汝州市| 霍林郭勒市| 贵溪市| 皮山县| 永康市| 大竹县| 雅安市| 冀州市| 中山市| 墨玉县| 峡江县| 闽侯县| 常熟市| 虎林市| 达拉特旗| 广平县| 济阳县| 台东市| 玉屏| 织金县| 淳安县|